"The New Jersey Department of Environmental Protection finalized its revision to the State Implementation Plan (SIP) to implement the 8-Hour Ozone National Ambient Air Quality Standard (NAAQS). The core of this SIP revision is the State’s demonstration that its two multi-state 8-hour ozone nonattainment areas will attain the 8-hour ozone NAAQS by their mandatory attainment date of June 15, 2010. The remainder of the SIP revision addresses the other mandatory SIP elements for 8-hour ozone (with the exception of a Reasonable Available Control Technology (RACT) analysis, which the Department of proposed on February 2, 2007 and will submit as final to the USEPA separately) and other related issues."
Both of the proposed and final SIP documents are posted on this webpage.
Appendix A |
The Nature of the Ozone Air Quality Problem in the Ozone Transport Region: A Conceptual Description |
Appendix B - Proposed
Appendix B - Final |
Air Quality Trends |
| Appendix C1 |
Memorandum of Understanding Among the States of the Ozone Transport Commission Concerning the Incorporation of High Electrical Demand Day Emission Reduction Strategies into Ozone Attainment State Implementation Planning |
| Appendix C2 |
Identification and Evaluation of Candidate Control Measures, Final Technical Support Document |
| Appendix C3 |
Resolution 06-02 of the Ozone Transport Commission Concerning Coordination and Implementation of Regional Ozone Control Strategies for Various Sources (Attachment 1) (zip file) |
| Appendix C4 |
Assessment of Control Technology Options for Petroleum Refineries in the Mid-Atlantic Region |
| Appendix D1 |
TSD-li: A Modeling Protocol for the OTC SIP Quality Modeling System for Assessment of the Ozone National Ambient Air Quality Standard in the Ozone Transport Region |
| Appendix D2-1 |
USEPA Modeling Guidance (2005) |
| Appendix D2-2 |
USEPA Modeling Guidance (2007) |
| Appendix D3 |
CMAQ Modeling Documentation |
| Appendix D3-1 |
TSD-1d: 8hr Ozone Modeling using the SMOKE/CMAQ System |
| Appendix D3-2 |
OTC CMAQ Air Quality Model Configuration |
| Appendix D3-3 |
Modeling Domain Boundary |
| Appendix D3-4 |
Horizontal Grid Definition of MM5 and CMAQ Modeling Domain |
| Appendix D3-5 |
Vertical Layer Definitions for MM5 and CMAQ Modeling Domain |
| Appendix D3-6 |
Report on the Set-up and Application of the 36km CMAQ Model and the Extraction of the Boundary Conditions |
| Appendix D4 |
Metrological Modeling and Supplemental Analyses |
| Appendix D4-1 |
TSD-1a: Metrological Modeling using Penn State/NCAR 5th Generation Mesoscale Model (MM5) |
| Appendix D4-2 |
Analysis of MM5 Simulations based on three PBL schemes over the eastern US for August 6 to 16, 2002 |
| Appendix D4-3 |
Numerical Experimental Analysis Data for the Year of 2002 |
| Appendix D4-4 |
MM5 Model Configuration |
| Appendix D4-5 |
Horizontal Grid Definition for MM5 and CMAQ Modeling Domain |
| Appendix D4-6 |
Vertical Layer Definitions for MM5 and CMAQ Modeling Domain |
| Appendix D4-7 |
Determination of Representativeness of 2002 Ozone Season for Ozone Transport Region SIP Modeling, Final Report |
| Appendix D5 |
TSD-1b: Processing of Biogenic Emissions for OTC/MANE-VU Modeling |
| Appendix D6 |
TSD-1c: Emission Processing for the Revised 2002 OTC Regional and Urban 12 km Base Case Simulations |
| Appendix D7 |
Technical Support Document for 2002 MANE-VU SIP Modeling Inventories, Version 3 (zip file) |
| Appendix D8-1 |
TSD-1f: Future Year Emissions Inventory for 8-HR OTC Ozone Modeling (Attachments 1-2) (zip file) |
| Appendix D8-2 |
Development of Emission Projections for 2009, 2012, and 2018 for Non-EGU Point, Area, and Nonroad Sources in the MANE-VU Region, Final TSD |
| Appendix D9 |
TSD-1j: Emission Processing for OTC 2009 OTW/OTB 12 km CMAQ Simulations |
| Appendix D10 |
TSD-1e: CMAQ Model Performance and Assessment 8-HR OTC Ozone Modeling ( Attachments 1-20) (zip file) |
| Appendix D11 |
TSD-1g: Relative reduction factor (RRF) and "Modeled Attainment Test" |
| Appendix D12 |
Calculation Methodology for Alternate RRFs and DVFs |
Appendix D13 - Proposed
Appendix D13 - Final |
Quantification of Additional Control Measures Not Included in the 2009 BOTW Modeling (and Attachments 1-2) (zip file) |
| Appendix D14 |
Unmonitored Area Analysis from the New York Department of Environmental Conservation and the Delaware Department of Natural Resources and Environmental Control |
Appendix E - Proposed
Appendix E - Final |
RFP Projected Inventories |
| Appendix E |
Attachment 1: Point Source Inventory Projections for 2008 and 2009 (zip file) |
| Appendix E |
Attachment 2: Area Source Inventory Projections for 2008 and 2009 (zip file) |
| Appendix E - Proposed |
Attachment 3: Nonroad Source Inventory Projections for 2008 and 2009 (zip file) |
| |
3-1: Nonroad Model Outputs (zip file) |
| |
3-2: Aircraft LTO Calculations (zip file) |
| |
3-3: Locomotive Calculations (zip file) |
| |
3-4: CMV Calculations (zip file) |
| |
3-5: VOC Final Nonroad Calculations (zip file) |
| |
3-6: NOx Final Nonroad Calculations (zip file) |
| Appendix E - Final |
Attachment 3: Nonroad Source Inventory Projections for 2008 and 2009 (zip file) |
| |
3-1: Nonroad Model Outputs (zip file) |
| |
3-2: Aircraft LTO Calculations (zip file) |
| |
3-3: Locomotive Calculations (zip file) |
| |
3-4: CMV Calculations (zip file) |
| |
3-5: VOC Final Nonroad Calculations (zip file) |
| |
3-6: NOx Final Nonroad Calculations (zip file) |
| Appendix E - Proposed |
Attachment 4: Onroad Source Inventory Projections for 2008 and 2009 (zip file) |
| |
4-1: NJTPA Onroad Files Vol 1 of 4_RFP_Conformity Runs (zip file) |
| |
4-1: NJTPA Onroad Files Vol 2 of 4_2008 RFP Benefit Runs (zip file) |
| |
4-1: NJTPA Onroad Files Vol 3 of 4_2009 RFP Benefit Runs (zip file) |
| |
4-1: NJTPA Onroad Files Vol 4 of 4_FMVCP Runs (zip file) |
| |
4-2: SJTPO Onroad Files Vol 1 of 3_RFP Conformity Runs (zip file) |
| |
4-2: SJTPO Onroad Files Vol 2 of 3_RFP Benefit Runs (zip file) |
| |
4-2: SJTPO Onroad Files Vol 3 of 3_FMVCP Runs (zip file) |
| |
4-3: DVRPC Onroad Files Conformity and RFP Runs (zip file) |
| |
4-4: Read Me_Onroad_RFP Results (zip file) |
| Appendix E - Final |
Attachment 4: Onroad Source Inventory Projections for 2008 and 2009 (zip file) |
| |
4-1: NJTPA Onroad Files Vol 1 of 4_RFP_Conformity Runs (zip file) |
| |
4-1: NJTPA Onroad Files Vol 2 of 4_2008 RFP Benefit Runs (zip file) |
| |
4-1: NJTPA Onroad Files Vol 3 of 4_2009 RFP Benefit Runs (zip file) |
| |
4-1: NJTPA Onroad Files Vol 4 of 4_FMVCP Runs (zip file) |
| |
4-2: SJTPO Onroad Files Vol 1 of 3_RFP Conformity Runs (zip file) |
| |
4-2: SJTPO Onroad Files Vol 2 of 3_RFP Benefit Runs (zip file) |
| |
4-2: SJTPO Onroad Files Vol 3 of 3_FMVCP Runs (zip file) |
| |
4-3: DVRPC Onroad Files Conformity and RFP Runs (zip file) |
| |
4-4: Read Me_Onroad_RFP Results (zip file) |
| Appendix F1 |
New Jersey Department of Transportation Project Analyses (zip file) |
| Appendix F2 |
New Jersey RACM Analysis Tables |
| Appendix F3 |
New Jersey Department of Transportation 2009 RACM - Political Feasibility |
| Appendix G |
Onroad Fleet Turnover Emission Reductions for 2010 (zip file) |
| Appendix H (Final Only) |
Public Participation |
| Appendix H |
Attachment 1: Notice of Availability |
| Appendix H |
Attachment 2: Documentation of the Notices that Appeared in the Newspapers and the New Jersey Register |
| Appendix H |
Attachment 3: Response to Comment Document |