|
Technical Manual Comments
| Draft Technical Manual Chapters Available for Comment |
| |
| Please submit comments to The Bureau of Nonpoint Pollution Control, Stormwater Management Unit. |
Draft Technical Manual Chapters Closed for Comment |
 |
Draft Constructed Stormwater Wetlands Chapter. Comment period ends March 2, 2011. Note: This chapter has a two-week comment period.
|
 |
Draft Wet Ponds Chapter. Comment period ends March 4, 2011. |
 |
Draft Extended Detention Basins Chapter. Comment period ends March 4, 2011. |
 |
Draft Vegetative Filters Chapter. Comment period ends March 4, 2011. |
 |
Draft Nonstructural Stormwater Management Strategies User Guide. Comment period ends February 20, 2011.
NJDEP Nonstructural Strategies Points System (NSPS) Comment period ends February 20, 2011. |
 |
Draft Sand Filter Chapter, Posted 09/13/10, Comment Period Closes October 6, 2010 |
 |
Special Water Resource Protection Area Requirements |
| |
Revised Draft Technical Manual Chapters |
 |
Grass Swale Chapter Comment Period was April 30 through June 1, 2010. |
| |
|
|