| Date |
Announcement Number & Description |
|---|
| 05/15/2013 |
QIA054 - Patented/Proprietary Items usage on all Contract Documents. See the Design section of the Forms page for forms DF15 and DF16. |
| 09/14/2012 |
CAN083 - Assignment of Structure Numbers for all structure types. |
| 06/28/2012 |
CAN082 - Revision to the Roadway Design Manual, Subsection 5.7.4, Public Sidcewalk Curb Ramps. |
| 02/10/2012 |
QIA052 - Consistent use of Project Name on all Contract Documents. |
| 02/01/2012 |
CAN080 - Design Criteria for Lighting Standards (with or without mast arm). |
| 02/04/2011 |
QIA051 - Use of firms without Cost Basis Approval for professional services. |
| 08/04/2010 |
CAN079 - Hot Mix Asphalt (HMA) mix compaction level and asphalt binder. |
| 07/28/2010 |
CAN078 - Item "Training Reimbursement" obsoleted. |
| 03/01/2010 |
CAN077 - Construction Activity Impacting Structures should be evaluated for Vibration, Settlement and Noise. |
| 09/02/2009 |
CAN076 - Construction Cost Estimating Guide revisions in Appendix H7 regarding Items for which a number has not been assigned . |
| 08/13/2009 |
QIA050 - Use of ARRA Whistleblowers Signage Poster on all American Recovery and Reinvestment Act Projects. See the QIA050Attachment (62 k). |
| 05/15/2009 |
QIA049 - ARRA Construction Identification Sign on all American Recovery and Reinvestment Act Projects. See the Construction Detail Sheet CD-159-10 (365 k). |
| 04/23/2009 |
CAN074 - Sample Plans 2007 revisions adding a column for sequence numbers when using ACES. See also Sample Plan Sheet 2 (pdf 548k) |
| 02/06/2009 |
QIA048 - The Stimulus Design Review Guidelines remind Designers to submit Final Design Submissions 100% complete, including the Design Communication Report and using the new QA Process as contained in the Capital Project Delivery Website. |
| 01/07/2009 |
CAN073 - Intelligent Transportation System (ITS) Guidelines - See the ITS web site for interim ITS guidelines. |
| 12/30/2008 |
QIA047 - Sample Utility Agreement Plan with traffic control component. It is recommended to print the Sample Utility Agreement Plan (1.2 m) in color. |
| 02/25/2008 |
CAN071 - Utility Owners Design Authorization Check List, Revised - to include Seasonal Time Frames, Notice Time Needed. Download attachment is form template. Also see CAN071Att (zip 12k) |
| 07/31/2007 |
QIA045 - Specifications for JCP&L Electric Facility Relocation for insertion into the Special Provisions of a subcontractor change. |
| 07/27/2007 |
CAN070R - REVISED DATE - Annual Update of Construction Cost Estimates using the Trns*port CES program and submit by August 14th. |
| 07/27/2007 |
QIA046 - Procedures for JCP&L Electric Facility Relocation with posting of Construction work order details and Summary on the BidX web site. |
| 06/15/2007 |
CAN069 - Revision to Traffic Impacts & Lane Closures with revisions to the General Notes of the Traffic Control Plans and the Special Provisions. |
| 06/05/2007 |
CAN068R - Base Map Preparation change to Ground Coordinates with Note for projects further along. |
| 05/02/2007 |
CAN065 - Map Filing Signature Statement for compliance with the Map Filing law. |
| 04/23/2007 |
CAN067 - Revised Quality Assurance Preliminary Design and Final Design Submission Distribution lists in order to streamline the level and magnitude of review. |
| 02/23/2007 |
QIA044 - Specifications for JCP&L Electric Facility Relocation for insertion into the Special Provisions, |
| 12/08/2006 |
QIA042 - Changes of Plan, |
| 08/04/2006 |
CAN063 - Image Vehicle Detection utilize as a direct replacement for Inductive Loops. |
| 04/07/2006 |
QIA041 - Correct Use of Sign Support Structures, |
| 06/23/2005 |
QIA040 - Crash Tested Bridge Railing Guide at the FHWA website, |
| 04/24/2005 |
CAN061 - Jurisdiction Agreement Procedures revisions address adjustments to the project delivery process. See also CAN061Att (pdf 3.01m) |
| 12/16/2004 |
CAN060 - Roadway User Cost manual revisions address lane restriction beyond allowable lane closure hours. See also CAN060Att (zip 13k) |
| 10/26/2004 |
QIA039 - Use of wood posts as means for sign support along highways, |
| 10/18/2004 |
QIA038 - Plan Display Boards for Public Meetings, |
| 06/11/2004 |
CAN059 - Steel Price Adjustment. |
| 11/21/2002 |
QIA037 - Preliminary Letter of Entry onto Private Property for Surveys/ Subsurface Investigations, |
| 09/26/2002 |
QIA036 - Dewatering Basins, |
| 09/26/2002 |
QIA035 - Use of NAD83 & NAVD88 as reference datum for horizontal control and vertical control on NJDOT projects, |
|
08/29/2002 |
CAN057 - Beam Guide Rail End Treatment. |
| 08/02/2002 |
QIA034 - Use of composite fender system and dolphins in marine sensitive environments, See also QIA034 Att (31k) |
| 06/28/2002 |
QIA033 - PSE&G Installation of Gas Mains & Related Work Specifications, |
| 04/23/2002 |
QIA032 - LOGO and TODS Signs, |
| 03/05/2002 |
CAN053 - Reset Beam Guide Rail. |
| 03/05/2002 |
QIA031 - Drainage Problems on Private Properties, |
| 03/05/2002 |
QIA030 - Access Control Issue, |
| 01/30/2002 |
CAN052 - Securing Change Control Board Approval. |
| 01/11/2002 |
CAN051 - Use of Sound Absorptive Material on Noise Walls. |
| 12/21/2001 |
QIA029 - Revised 2001 Specification Implementation Dates, |
| 11/13/2001 |
QIA028 - Use of NCHRP 350 Compliant Type 3 Barricades, |
| 10/26/2001 |
CAN050 - Security Measures for Field Work. |
| 09/21/2001 |
CAN048 - Denials of Access Procedures. |
| 09/13/2001 |
CAN047 - Cost Backup Information for Nonstandard Items and Standard Lump Sum Items. |
| 09/13/2001 |
QIA027 - Temporary Traffic Control Zone Activities by Consultants, |
| 08/01/2001 |
CAN045 - Implementation of Subsurface Utility Engineering. |
| 07/02/2001 |
CAN044 - Verification Reviews. |
| 07/02/2001 |
QIA026 - Use of Project Identification, |
| 05/25/2001 |
CAN043 - Release of Retainage/ Escrow to Consultants. |
| 05/17/2001 |
QIA025 - Use of Open Graded Surface Course, |
|
04/10/2001 |
CAN042 - Use of MUTCD 2000 Standards. |
| 02/30/2001 |
CAN041 - Converting Metric to English Standards. |
| 02/01/2001 |
CAN038 - Revision to Subsection 108.02 (Subcontracting). |
| 09/12/2000 |
QIA024 - Development of Special Provisions, see also QIA024Att
(43k) |
| 08/08/2000 |
CAN032 - Traffic Signal Standard Type KE. |
| 05/17/2000 |
QIA023 - Clarifications in the Submission Requirements of Consultants Invoices |
| 12/20/1999 |
CAN027 - Design Exception Requirements for Substandard Vertical Clearance. |
| 09/30/1999 |
QIA022 - Field Verification of Existing Conditions, |
| 09/28/1999 |
QIA021 - Use of 3-Sided Rigid Frame Structures, |
|
09/20/1999 |
CAN025 - Clarification of Right of Way Requirements. |
| 08/26/1999 |
CAN023 - Use of Current Design Standards. |
| 07/26/1999 |
QIA020 - Use of Gray Cement & Type I Cement, |
| 07/23/1999 |
QIA019 - Substandard Design Elements on Transition Projects, |
| 05/19/1999 |
CAN021 - Rumble Strip Installation Requirements. |
| 04/23/1999 |
QIA018 - Revised FHWA Authorization Process, see also QIA018Att (27k) |
| 03/31/1999 |
QIA017 - Beam Guide Rail Findings, |
| 02/22/1999 |
CAN015 - Securing Funding for Additional Work. |
| 01/06/1999 |
QIA016 - Precast Concrete Construction Barrier, |
| 11/30/1998 |
QIA015 - Use of Wedge Joint in Paving Operations, |
| 10/09/1998 |
QIA014 - Project Design Schedules, |
| 09/23/1998 |
QIA013 - Use of Moveable Construction Barrier, |
| 04/09/1998 |
QIA012 - Top 10 Reasons why design exception reports are returned, |
| 04/02/1998 |
QIA011 - Accuracy of Plan Information, |
| 03/16/1998 |
QIA010 - Quick-Setting Patch Materials in Full Depth Repair Applications |
| 03/12/1998 |
CAN008 - Metric Accuracy of Sample Plans. |
| 03/06/1998 |
QIA009 - Weathering Beam Guide Rail |
| 02/23/1998 |
QIA008 - Beam Guide Rail Audit |
| 02/16/1998 |
CAN007 - Consultant Performance Evaluations. |
| 09/23/1997 |
QIA007 - Soil conditions & the deflection and rotation of sheet pile walls |
| 05/01/1997 |
CAN004 - Information necessary for accurate Right of Way Plans. |
| 04/07/1997 |
QIA006R - Right of Way Availability |
| 01/31/1997 |
QIA005 - Approved Fencing Supports |
|
|
| 09/25/1996 |
QIA004 - Coordination with State Highway Authorities |
| 09/30/1996 |
QIA003 - Drainage recommendations for future projects |
| 09/25/1996 |
QIA002 - Concrete Deck Repair Problems - Recommend evaluate decks quantities |
| 09/27/1996 |
QIA001 - Project Baseline Scope Change recommendations |
| ADU 1994-10-03 |
Access Control at Jughandles & Interchanges & Driveways Reviews |
ADU 1991-03-19 |
Highway Section Submissions |
ADU 1990-08-08 |
Traffic Stripes on Freeway and Interstate Ramp |
ADU 1990-07-01 |
Procedure for Utility and Railroad Facility Relocations |
ADU 1988-06-28 |
Wetlands Planting Plans |
ADU 1986-12-10 |
Pipe Materials & Alternate Drainage Designs Partially Revised |
ADU 1970-06-03 |
Trade Names |
ADU 1968-06-19 |
Partial Demolitions and party Walls |
ADU 1968-05-27 |
Phase 2 Right of Way Requirements for Party Walls & Partial Demolitions |
ADU 1966-08-02 |
Guide to Berm widths for Rock Cut Sections |
ADU 1966-05-06 |
Maintenance of Control of Access by Fencing |
ADU 1966-02-14 |
As-Built Plans |
ADU 1965-05-19 |
Plans for Demolition Projects |
ADU 1965-03-24 |
Treatment of Exist Concrete Pavement Under New Pavement |