CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES ROUTE I-78 RESURFACING CONTRACT NO. 018054020 FROM ROUTE 31 INTERCHANGE TO POTTERSTOWN OLDWICK ROAD TOWNSHIPS OF CLINTON AND READINGTON HUNTERDON COUNTY BOROUGH OF LEBANON D.P. NO. 05131 BIDS RECEIVED AUGUST 23, 2005 CONTRACT AWARD DATE SEPTEMBER 21, 2005 BIDDERS TOTAL PRICE BID 1 . INTERCOUNTY PAVING ASSOC LLC $ 8,555,555.00 859 WILLOW GROVE STREET HACKETTSTOWN NJ07840 2 . SCHIFANO CONSTRUCTION CORP $ 8,844,013.90 1 SMALLEY AVENUE MIDDLESEX NJ08846 3 . TILCON OF NEW YORK INC $ 8,922,000.00 625 MT HOPE ROAD WHARTON NJ07885 4 . CRISDEL GP INC $ 9,178,780.63 240 RYAN ST SO PLAINFIELD NJ07080 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 71,320.00 71,320.00 43,000.00 43,000.00 2 FINAL CLEANUP LS 1 10,000.00 10,000.00 5,000.00 5,000.00 3 CONSTRUCTION LAYOUT LS 1 52,070.95 52,070.95 77,800.00 77,800.00 4 NO ITEM U 0 .00 0.00 .00 0.00 5 NO ITEM U 0 .00 0.00 .00 0.00 6 FIELD OFFICE TYPE A SET-UP U 1 21,443.00 21,443.00 24,685.00 24,685.00 7 FIELD OFFICE TYPE A MAINTENANCE MO 18 1,928.00 34,704.00 1,800.00 32,400.00 8 TELEPHONE SERVICE LS 1 3,000.00 3,000.00 3,000.00 3,000.00 9 FUEL PRICE ADJUSTMENT LS 1 18,700.00 18,700.00 18,700.00 18,700.00 10 NO ITEM U 0 .00 0.00 .00 0.00 11 NO ITEM U 0 .00 0.00 .00 0.00 12 NO ITEM U 0 .00 0.00 .00 0.00 13 NO ITEM U 0 .00 0.00 .00 0.00 14 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 5,671.00 5,671.00 21,400.00 21,400.00 LIABILITY INSURANCE 15 TRAINING REIMBURSEMENT LS 1 145,500.00 145,500.00 145,500.00 145,500.00 16 PROGRESS SCHEDULE LS 1 13,000.00 13,000.00 7,500.00 7,500.00 17 MOBILIZATION LS 1 456,111.00 456,111.00 672,500.00 672,500.00 18 CLEARING SITE LS 1 35,549.00 35,549.00 5,000.00 5,000.00 19 NO ITEM U 0 .00 0.00 .00 0.00 20 MILLING, 2 1/2" DEPTH SY 251,630 3.05 767,471.50 2.45 616,493.50 21 MILLING, 3 1/2" AVERAGE DEPTH SY 64,268 4.75 305,273.00 3.20 205,657.60 22 MILLING, VARIABLE DEPTH SY 1,000 6.94 6,940.00 5.00 5,000.00 23 PROFILE MILLING SY 1,000 6.94 6,940.00 5.00 5,000.00 24 NO ITEM U 0 .00 0.00 .00 0.00 25 INLET FILTERS U 150 25.50 3,825.00 25.00 3,750.00 26 NO ITEM U 0 .00 0.00 .00 0.00 27 NO ITEM U 0 .00 0.00 .00 0.00 28 BITUMINOUS CONCRETE PATCH T 120 1.00 120.00 60.00 7,200.00 29 CORE SAMPLES, HOT MIX ASPHALT U 150 100.00 15,000.00 125.00 18,750.00 30 CONCRETE PAVEMENT REPAIR PRIOR TO OVERLAY SY 50 330.00 16,500.00 200.00 10,000.00 31 TACK COAT GAL 31,600 .01 316.00 .01 316.00 32 ASPHALT PRICE ADJUSTMENT LS 1 57,800.00 57,800.00 57,800.00 57,800.00 33 SLAB STABILIZATION URETHANE GROUT LBS 160,000 5.20 832,000.00 5.16 825,600.00 34 POLYMERIZED JOINT ADHESIVE LF 165,000 1.30 214,500.00 1.15 189,750.00 35 SUPERPAVE HOT MIX ASPHALT 19H76 INTERMED TON 41,080 50.00 2,054,000.00 57.50 2,362,100.00 COURSE 36 SUPERPAVE HOT MIX ASPHALT 12.5H76 SURFACE T 37,634 50.00 1,881,700.00 55.80 2,099,977.20 COURSE 37 SAWING AND SEALING JOINTS IN HOT MIX ASPHALT LF 190,400 1.60 304,640.00 1.53 291,312.00 OVERLAY 38 SAWING JOINTS IN INTERMEDIATE OR BASE COURSE LF 190,400 .70 133,280.00 .90 171,360.00 39 NO ITEM U 0 .00 0.00 .00 0.00 40 NO ITEM U 0 .00 0.00 .00 0.00 41 NO ITEM U 0 .00 0.00 .00 0.00 42 NO ITEM U 0 .00 0.00 .00 0.00 43 NO ITEM U 0 .00 0.00 .00 0.00 44 NO ITEM U 0 .00 0.00 .00 0.00 45 NO ITEM U 0 .00 0.00 .00 0.00 46 NO ITEM U 0 .00 0.00 .00 0.00 47 NO ITEM U 0 .00 0.00 .00 0.00 48 NO ITEM U 0 .00 0.00 .00 0.00 49 NO ITEM U 0 .00 0.00 .00 0.00 50 SLOTTED GUIDE RAIL TERMINALS U 2 2,200.00 4,400.00 2,500.00 5,000.00 51 REMOVAL OF GUIDE RAIL LF 3,072 2.15 6,604.80 2.30 7,065.60 52 BEAM GUIDE RAIL LF 2,998 16.25 48,717.50 23.60 70,752.80 53 NO ITEM U 0 .00 0.00 .00 0.00 54 NO ITEM U 0 .00 0.00 .00 0.00 55 BEAM GUIDE RAIL ANCHORAGES U 1 800.00 800.00 1,150.00 1,150.00 56 NO ITEM U 0 .00 0.00 .00 0.00 57 NO ITEM U 0 .00 0.00 .00 0.00 58 NO ITEM U 0 .00 0.00 .00 0.00 59 TRAFFIC DIRECTORS, FLAGGERS HRS 1,000 60.00 60,000.00 1.00 1,000.00 60 CONSTRUCTION SIGNS SF 1,124 13.00 14,612.00 15.00 16,860.00 61 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 8 12,929.00 103,432.00 1.00 8.00 CRASH CUSHIONS 62 DRUMS U 500 100.00 50,000.00 1.00 500.00 63 TRUCK-MOUNTED ILLUMINATED FLASHING U 8 2,722.00 21,776.00 1,500.00 12,000.00 ARROWS, 4' X 8' 64 BREAKAWAY BARRICADES U 200 102.00 20,400.00 1.00 200.00 65 NO ITEM U 0 .00 0.00 .00 0.00 66 TRAFFIC CONES U 1,000 20.00 20,000.00 20.00 20,000.00 67 VARIABLE MESSAGE SIGNS U 2 11,568.00 23,136.00 15,000.00 30,000.00 68 TRAFFIC STRIPES LF 111,200 .28 31,136.00 .23 25,576.00 69 NO ITEM U 0 .00 0.00 .00 0.00 70 TWO-WAY PLOWABLE MONO-DIRECTIONAL U 1,375 32.90 45,237.50 28.20 38,775.00 WHITE PAVEMENT RELECTORS AND CASTINGS 71 RUMBLE STRIP LF 106,000 .20 21,200.00 .50 53,000.00 72 TWO-WAY PLOWABLE MONO-DIRECTIONAL U 700 32.90 23,030.00 28.20 19,740.00 AMBER PAVEMENT RELECTORS AND CASTINGS 73 TRAFFIC STRIPES, LONG LIFE, EPOXY RESIN LF 111,200 .36 40,032.00 .40 44,480.00 74 TRAFFIC MARKINGS, LINES, LONG LIFE, LF 4,000 .74 2,960.00 .92 3,680.00 THERMOPLASTIC 75 TRAFFIC STRIPES, LONG LIFE, LF 111,200 4.00 444,800.00 3.85 428,120.00 PREFORMED TAPES 76 REMOVAL OF PAVEMENT REFLECTORS AND CASTINGS U 2,060 3.40 7,004.00 5.00 10,300.00 77 FLEXIBLE DELINEATORS, GUIDE RAIL MOUNTED U 40 11.35 454.00 20.00 800.00 78 NO ITEM U 0 .00 0.00 .00 0.00 79 NO ITEM U 0 .00 0.00 .00 0.00 80 TOPSOILING, 4" THICK SY 1,000 1.65 1,650.00 4.00 4,000.00 81 LOOP DETECTOR REPAIR U 1 5,671.00 5,671.00 16,550.00 16,550.00 82 FERTILIZING AND SEEDING, TYPE A-3 SY 1,000 .50 500.00 1.00 1,000.00 83 FERTILIZING AND SEEDING, TYPE F SY 1,000 .45 450.00 1.00 1,000.00 84 TURF REPAIR STRIP LF 49,942 1.50 74,913.00 1.85 92,392.70 85 STRAW MULCHING SY 1,000 .50 500.00 1.00 1,000.00 86 BROKEN STONE SURFACE TREATMENT 4" THICK SF 5,005 2.95 14,764.75 2.50 12,512.50 87 NO ITEM U 0 .00 0.00 .00 0.00 88 NO ITEM U 0 .00 0.00 .00 0.00 89 NO ITEM U 0 .00 0.00 .00 0.00 90 NO ITEM U 0 .00 0.00 .00 0.00 91 NO ITEM U 0 .00 0.00 .00 0.00 92 NO ITEM U 0 .00 0.00 .00 0.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 8,555,555.00 $ 8,844,013.90 BRIDGE ITEMS 0.00 0.00 SUB-TOTAL AMOUNTS FOR BRIDGE WORK AGREE AGREE (HEADER) LOW BID =$ 8,555,555.00 (HEADER) 2ND LOW BID =$ 8,844,013.90 COMPUTED LOW BID =$ 8,555,555.00 COMPUTED 2ND LOW BID =$ 8,844,013.90 COMPUTED LOW BID =$ 8,555,555.00 COMPUTED 2ND LOW BID =$ 8,844,013.90