CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES MAINTENANCE BEAM GUIDE RAIL REPAIR CONTRACT, CENTRAL - 2006 VARIOUS ROUTES IN THE COUNTIES OF HUNTERDON, MERCER, MIDDLESEX, MONMOUTH, OCEAN, SOMERSET, AND WARREN, SOUTH OF ROUTE 57 D.P. NO. 06414 BIDS RECEIVED MAY 25, 2006 CONTRACT AWARD DATE JUNE 08, 2006 BIDDERS TOTAL PRICE BID 1 . HIGHWAY SAFETY SYSTEMS $ 952,350.00 P O BOX 591 HAMMONTON NJ08037 2 . M L RUBERTON CONSTRUCTION CO INC $ 1,008,805.00 219 N WHITE HORSE PIKE HAMMONTON NJ08037 3 . J FLETCHER CREAMER & SON INC $ 1,399,444.00 101 E BROADWAY HACKENSACK NJ07601 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 10,000.00 10,000.00 10,000.00 10,000.00 2 CONSTRUCTION LAYOUT LS 1 10,000.00 10,000.00 1.00 1.00 3 CELLULAR PHONE AND PAGER SERVICE LS 1 2,750.00 2,750.00 2,750.00 2,750.00 4 TELEPHONE SERVICE LS 1 750.00 750.00 750.00 750.00 5 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 2,000.00 2,000.00 3,500.00 3,500.00 LIABILITY INSURANCE 6 MOBILIZATION LS 1 15,000.00 15,000.00 15,000.00 15,000.00 7 SPECIAL MOBILIZATION U 12 1,000.00 12,000.00 400.00 4,800.00 8 EMERGENCY MOBILIZATION U 1 1,000.00 1,000.00 1,000.00 1,000.00 9 EARTH EXCAVATION FOR TEST PITS U 2 1.00 2.00 1.00 2.00 10 9" X 16" WHITE CONCRETE VERTICAL CURB LF 135 1.00 135.00 15.00 2,025.00 11 CABLE GUIDE WIRE LF 5,360 8.00 42,880.00 5.00 26,800.00 12 CABLE GUIDE WIRE ANCHORAGES U 3 600.00 1,800.00 550.00 1,650.00 13 INTERMEDIATE CABLE GUIDE WIRE ANCHOR U 3 600.00 1,800.00 550.00 1,650.00 ASSEMBLY 14 BEAM GUIDE RAIL LF 16,000 15.00 240,000.00 15.00 240,000.00 15 BEAM GUIDE RAIL, DUAL-FACED LF 425 20.00 8,500.00 26.00 11,050.00 16 SLOTTED GUIDE RAIL TERMINALS U 70 2,000.00 140,000.00 2,450.00 171,500.00 17 EXTRUDER TERMINALS U 11 3,000.00 33,000.00 3,300.00 36,300.00 18 CONTROLLED RELEASE TERMINALS U 6 500.00 3,000.00 500.00 3,000.00 19 CONTROLLED RELEASE TERMINAL ANCHORAGES U 3 500.00 1,500.00 500.00 1,500.00 20 BEAM GUIDE RAIL ANCHORAGES U 13 500.00 6,500.00 700.00 9,100.00 21 TELESCOPING GUIDE RAIL END TERMINALS U 14 4,000.00 56,000.00 4,400.00 61,600.00 22 BEAM GUIDE RAIL POSTS U 95 40.00 3,800.00 46.00 4,370.00 23 BEAM GUIDE RAIL ELEMENT LF 18,000 10.00 180,000.00 13.25 238,500.00 24 TRI-BEAM GUIDE RAIL ELEMENT LF 1,200 10.00 12,000.00 10.75 12,900.00 25 RUB RAIL LF 550 10.00 5,500.00 5.00 2,750.00 26 RESET BEAM GUIDE RAIL WITH EXISTING POSTS LF 1,250 1.00 1,250.00 1.00 1,250.00 27 REMOVAL OF GUIDE RAIL LF 14,500 1.00 14,500.00 .50 7,250.00 28 BEAM GUIDE RAIL POSTS, EXCLUDING SPACERS U 12 35.00 420.00 46.00 552.00 29 BEAM GUIDE RAIL POSTS, ADDITIONAL LENGTH U 25 50.00 1,250.00 57.00 1,425.00 30 DRILLING OR CORING FOR BEAM GUIDE RAIL U 10 1.00 10.00 1.00 10.00 POSTS, NON-BRIDGE 31 SAWCUTTING FOR BEAM GUIDE RAIL POSTS, LF 40 1.00 40.00 1.00 40.00 NON-BRIDGE 32 BEAM GUIDE RAIL INSTALLATION IN ROCK U 3 1.00 3.00 100.00 300.00 33 RESET BEAM GUIDE RAIL WITH NEW POSTS LF 48 1.00 48.00 5.00 240.00 34 ATTACHMENT TO STRUCTURE, BALUSTRADE LF 32 49.00 1,568.00 40.00 1,280.00 DETAIL NO. CD-612-10.1 35 ATTACHMENT TO STRUCTURE, DETAIL LF 110 100.00 11,000.00 40.00 4,400.00 NO. CD-612-10.2 36 ATTACHMENT TO STRUCTURE, DETAIL NO. U 3 250.00 750.00 60.00 180.00 CD-612-10.2, WITH EXISTING BEAM GUIDE RAIL ELEMENT 37 ATTACHMENT TO STRUCTURE, DETAIL U 10 999.00 9,990.00 800.00 8,000.00 NO. CD-612-9.1, TYPE A 38 ATTACHMENT TO STRUCTURE, DETAIL U 10 100.00 1,000.00 275.00 2,750.00 NO. CD-612-9.1, TYPE B 39 EXTRA SPACER BLOCKS U 50 20.00 1,000.00 15.00 750.00 40 REMOVAL OF WIRE ROPE GUARD FENCE LF 1,000 1.00 1,000.00 .10 100.00 41 REMOVAL OF DUAL FACED BEAM GUIDE RAIL LF 165 3.00 495.00 1.00 165.00 42 REMOVAL OF MEDIAN BREAKAWAY CABLE TERMINAL U 6 500.00 3,000.00 100.00 600.00 43 REMOVAL OF BREAKAWAY CABLE TERMINAL- U 6 100.00 600.00 200.00 1,200.00 INCLUDING FOOTING 44 GUIDE RAIL EXTRUDERS U 3 750.00 2,250.00 675.00 2,025.00 45 WOOD POSTS FOR EXTRUDER TERMINALS U 13 100.00 1,300.00 41.00 533.00 46 BUFFER END PIECES FOR END TREATMENTS U 25 250.00 6,250.00 88.00 2,200.00 47 WOODEN POSTS FOR END TREATMENTS U 25 100.00 2,500.00 41.00 1,025.00 48 RAIL ELEMENTS FOR END TREATMENTS U 15 250.00 3,750.00 175.00 2,625.00 49 REFLECTIVE SHEETING FOR END TREATMENTS SF 30 1.00 30.00 6.00 180.00 50 BREAKAWAY BARRICADES U 10 1.00 10.00 1.00 10.00 51 DRUMS U 20 1.00 20.00 1.00 20.00 52 TRAFFIC CONES U 125 1.00 125.00 1.00 125.00 53 CONSTRUCTION SIGNS SF 672 1.00 672.00 1.00 672.00 54 TRAFFIC DIRECTORS, FLAGGERS HRS 80 1.00 80.00 1.00 80.00 55 ILLUMINATED FLASHING ARROWS, 4' X 8' DAY 100 50.00 5,000.00 50.00 5,000.00 56 TRAFFIC CONTROL TRUCKS WITH MOUNTED CRASH DAY 100 350.00 35,000.00 300.00 30,000.00 CUSHIONS AND ILLUMINATED FLASHING ARROWS, 4' X 8' 57 VARIABLE MESSAGE SIGNS DAY 20 10.00 200.00 10.00 200.00 58 ATTACHMENT TO STRUCTURE, DETAIL U 2 1.00 2.00 300.00 600.00 NO. CD-612-9.2 59 TOPSOILING, 4" THICK SY 685 1.00 685.00 1.00 685.00 60 REGRADE BERM SY 235 1.00 235.00 1.00 235.00 61 FERTILIZING AND SEEDING, TYPE A-3 SY 1,200 1.00 1,200.00 .25 300.00 62 STRAW MULCHING SY 1,200 1.00 1,200.00 .25 300.00 63 NONVEGETATIVE SURFACE, HOT MIX ASPHALT SY 500 20.00 10,000.00 20.00 10,000.00 64 NON-VEGETATIVE SURFACE, POLYESTER MATTING SY 700 20.00 14,000.00 20.00 14,000.00 65 ADIEM ENERGY ABSORBING END TREATMENT MOD 30 1,000.00 30,000.00 1,500.00 45,000.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 952,350.00 $ 1,008,805.00 BRIDGE ITEMS 0.00 0.00 SUB-TOTAL AMOUNTS FOR BRIDGE WORK AGREE AGREE (HEADER) LOW BID =$ 952,350.00 (HEADER) 2ND LOW BID =$ 1,008,805.00 COMPUTED LOW BID =$ 952,350.00 COMPUTED 2ND LOW BID =$ 1,008,805.00 COMPUTED LOW BID =$ 952,350.00 COMPUTED 2ND LOW BID =$ 1,008,805.00