Traffic
Mitigation Plan
Since the Route 183 Bridge
over New Jersey Transit
(NJT) will be replaced
in the same location, there
is inadequate room to maintain
traffic across it during
demolition/construction.
A temporary closure of
Route 183 north of Route
46 will be required for
approximately one year,
during a portion of the
project's overall anticipated
two year construction duration.
Route 183 thru traffic
will be detoured (pdf
517k) via Route 206 (a
portion of which runs together
with I-80 before splitting)
to Stanhope, where Route
183 terminates. All of
Route 46 within the project
limits, and Route 183 south
of Route 46, will be kept
open throughout construction
by utilizing multiple construction
stages. Temporary traffic
signals will help mitigate
traffic at the Route 46/183
intersection during construction.
The above files are in
Portable Document Format
(PDF). You will need Adobe
Acrobat Reader, which is
available free from the state
Adobe Access page, to view
the files. |