Department of Transportation

Overview

The New Jersey Department of Transportation (NJDOT) issues these Design Document Change Announcements:

Baseline Document Change (BDC)

Announcements are notices that a Baseline Document has been modified in part or in whole. A Baseline document is defined as any official document that has gone through an initial approval process and was approved for use as intended. A BDC is an alteration to or rewriting of any officially approved document. New documents are also announced with a BDC.

Corrective Action Notices (CAN)

Notices that identify and address problems that may lead to additional costs, impact project schedules, or may be systemic in nature. They include a corrective action plan designed to eliminate the possibility of a recurrence. When these changes alter any Baseline Document, a Baseline Document Change (BDC) Announcement follows.

Quality Improvement Advisories (QIA)

Advisories that notify of problems that have occurred. They include possible solutions and lessons learned. Other uses include notification of efforts to minimize impacts to the project delivery schedule as well as avoiding unanticipated costs associated with project changes.

Document Codes:
D   - Construction Detail PR - Procedure
MB - Design Manual, Bridge S   - Specification
MR - Design Manual, Roadway T   - Other
Implementation Codes are available in BDC03T-06, and the Standard Distribution procedure is available in BDC03T-04.

BDC/CAN/QIA Number and Description
2024
07/01/2024 BDC24S-10Delay Damages Equipment Escalation, Measurement and Payment Certification, and Claim Clarification –– Revisions to Subpart 104.03.09 and Subsections 109.03, 109.04, and 109.09 of the 2019 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.
06/25/2024 BDC24S-08Revision to the definition of “Completion” – Revisions to Subsection 101.03 of the 2019 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.
06/20/2024 BDC24D-01Updating Traffic Stripes and Markings Details – Revision to the 2016 Standard Construction Details – Roadway, Sheets CD-610-8, CD-610-9, CD-610-10, CD-610-11, CD-610-13, and CD-610-14. See the updated Attachment (pdf 1.19M) and the CADD Support Webpage for the CADD.
06/11/2024 BDC24S-07Surety's completion-contractor Selection and The Department Approval Procedure – Revisions to Subsection 108.14 of the 2019 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.
06/06/2024 BDC24S-04Updated Bidding and Total Adjusted Contract Price Requirements – Revision to the 2019 Standard Specifications for Road and Bridge Construction, Subparts 102.13.01.C, 105.02.05.1.a, and 105.02.05.2.a. See the updated Standard Inputs.
05/28/2024 BDC24S-06Fiberless SMA and Binder Sampling -– Revisions to the 2019 Standard Specifications for Road and Bridge Construction, Subparts 404.03.01, 902.05.01 and 902.05.03, and Subsections 1009.01 and 1009.03. See the updated Standard Inputs.
05/22/2024 BDC24S-05Equipment Delay Damage for Non-Productive Activity - Revisions to Subpart 104.03.09.1.e of the 2019 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.
05/10/2024 CAN-095 Broadband Initiative
04/18/2024 BDC24S-03Construction Layout costs for Minor Quantity Changes, and Mandatory Site Investigation Reports - Revisions to Subparts 104.03.03.1 and 104.03.03.3, and Subsection 105.11 of the 2019 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.
04/04/2024 BDC24S-02Drilled Shaft Report Response Timeframe - Revisions to Subparts 503.03.03, 503.03.04, and 503.03.05 of the 2019 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.
03/27/2024 BDC24S-01Modifying an Inlet or Manhole- Revisions to Subpart 602.03.03 of the 2019 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.
03/19/2024 BDC23S-22Materials Field Laboratory and Curing Facility Field and Office Equipment - Revisions to Subsection 156.03 and Subparts 156.03.01 and 156.03.03, and Subsection 156.04 of the 2019 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.
03/05/2024 BDC23S-20Contractor Certification of Payment to Subcontractors and Suppliers - Revision to the 2019 Standard Specifications for Road and Bridge Construction, Subsection 109.05. See the updated Standard Inputs.
2/19/2024 BDC23S-21BABA Waiver for De Minimis Costs and Small Grants - Revisions to Subsection 106.03 of the 2019 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.
1/26/2024 CAN 086RNJDOT Guidance on MASH Implementation for Bridge Railings and Other Bridge Related Safety Features.


Last updated date: June 27, 2024 8:13 AM