Technical Proposal
TP-179
Question 1: Can the organization chart be submitted on 11” by 17” paper?
Answer 1: Yes.
Question 2: The Traffic Engineer is required to have “Training in Highway Capacity Analysis Software HCM, TRANSIT 7F, PARS2 Synchro,” however, DOT Technical practice is Synchro and HCS. Please verify if TRANSIT 7F and PARS2 are still required.
Answer 2: TRANSIT 7F and PARS2 are no longer used by the NJDOT and are not required.
|