Planned Advertisements


6-Month Look Ahead


IMPORTANT
Read our disclaimer before downloading or attempting
to use any of the files from this site
.

Capital Program Management

Project/Work Description

 

UPC #950229
Rt 15, Bridge over Abandoned Mt. Hope Mineral RR Br (3)

Replacement of the bridge deck and replacement of the bridge parapet of the Route 15 SB bridge over the abandoned Mount Hope Mineral Railroad - Structure No. 1403-153. Route 15 milepost 2.30.

Proposed Advertised Month May, 2012

Project Details

Morris County/Wharton Boro

MP: 2.15-2.67

Estimate Range $1,000,001 to $5,000,000


UPC #993880

James Street over I-287 Deck Replacement
This project will address the proposed deck replacement. The overall condition of this structure is satisfactory; however, the deck has deteriorated to the point that it requires replacement.

Proposed Advertised Month May, 2012

Project Details

Morris County/Morris Township

MP: 34.58-34.80

Estimate Range $1,000,001 to $5,000,000


UPC #103180
Rt 34/35 Colts Neck and Wall Twps, Resurfacing

Pavement rehabilitation at the following locations:

Colts Neck Township: Route 34 Northbound and Southbound: MP 12.0 - 13.2 Wall Township: Route 35 Northbound: MP 20.2 - 21.0; Route 35 Southbound: MP 20.5 - 21.5. Structures within the project limits:
1317-158; 1317-159: Rt. 138 over Rt. 35 (no involvement)

1308-156; 1308-157: Rt. 34 over Rt. 18 (deck repairs and beam guide rail work)

Proposed Advertised Month May, 2012

Project Details

Monmouth County/Colts Neck & Wall Township

MP: 12-13.2

Estimate Range $1,000,001 - $5,000,000


UPC #018240
Rt 9 Lacey Road Intersection Improvements

The project proposes to improve the operation of the intersection by implementing following measures, in order to provide a safe, reliable roadway that meet current design standards and improves safety in the area. Route 9 NB approach will have one left-turn lane, one through lane and one through/right lane; Route 9 SB approach will have two through lanes and an exclusive right-turn lane. Lacey Road EB approach will have a double left-turn lane, a through lane and a right-turn lane; Lacey Road WB will have a left, a shared through/right lane. The Route 9 SB approach left turn lane has been eliminated. Through coordination with the township, this movement will be achieved utilizing the existing left and U-Turn movement via Oak Street and Parker Avenue. A left turn from Route 9 SB to Jones Road will also be provided. In addition, the intersection's drainage system will be improved with additional inlets to eliminate ponding. To improve the operation of the intersection, additional ROW will be required.

Proposed Advertised Month May, 2012

Project Details

Ocean County/Lacey Township

MP: 81.44-81.82

Estimate Range $1,000,001 - $5,000,000


UPC #118045
Rt 295/42/I-76, Direct Connect, Advanced ITS Contract

This project will provide Intelligent Transportation Systems (ITS), electronic and communications equipment along corridors that approach and leave the interchange. The elements include Adaptive Traffic Signal Systems along Routes 130 & 168, Dynamic Message Signs (DMS), Closed Circuit Television Cameras (CCTV), Bluetooth Travel Time Detectors, TRANSMIT readers, along with the installation of three interim communication hubs. The installation of these elements will allow the Department to manage these traffic corridors for higher levels of safety and efficiency.

Proposed Advertised Month May, 2012

Project Details

Camden County/Gloucester City, Bellmawr Boro, & Mount Ephraim Boro

MP: 26.03-28.16

Estimate Range $5,000,001 - $10,000,000


UPC #093230
Rt 4 over Flat Rock Brook

This project will replace the existing deck on the Route 4 over Flat Rock Brook structure (Str. # 0206-181). This structures carries five (5) lanes of traffic (3-eastbound and 2-westbound) with an ADT of 82,236 (year 2004).

Proposed Advertised Month May, 2012

Project Details

Bergen County/Englewood City

MP: 9.29-9.79

Estimate Range $1,000,001 - $5,000,000


UPC #113940
Rt 36, S of Miller Av to N of Union Av (CR 39), Resurfacing

The project involves milling and pavement resurfacing of Rt. 36 in the following municipalities of Monmouth County: Highlands Borough, Middletown Twp., Atlantic Highlands Borough, Hazlet Twp. & Union Beach Borough.

Proposed Advertised Month May, 2012

Project Details

Monmouth County/Highlands Borough, Middletown Twp., Atlantic Highlands Borough, Hazlet Twp. & Union Beach Borough

MP: 12.2-22.3; 12.9-17.0

Estimate Range $5,000,001 - $10,000,000


UPC #003712
Rt 80 Parsippany-Troy Hills Rdwy Improvements

This project will improve traffic flow at the I-80 interchange with I-287. These improvements include ramp reconfiguration, acceleration/deceleration lanes and safety items. The project also includes the reconstruction of the pavement on I-80 for approximately 4 miles.

Proposed Advertised Month May, 2012

Project Details

Morris County/Parsippany-Troy Hills Twp.

MP: 41.5-45.6; 41.5-42.5

Estimate Range over $10,000,000.00


UPC #103240
I-287 S of South St to Littleton Rd pavemnt & deck repl over

Pavement resurfacing NB from S. of South St (CR 601) to Littleton Rd. (CR 630), SB from S. of South St. (CR 601) to Littleton Rd. (CR 630). Pavement resurfacing Rank #14 on the 2008 Pavement Projects List. The bridges involve in this project are listed in the following:
Bridge over Railroad and Edan Lane (Structure No. 1419188); Bridge over Route 10 (Structure No. 1419191); Bridges over I-80 (Structure Nos. 1420151, 1414168)

Proposed Advertised Month May, 2012

Project Details

Morris County/Morristown Town, Morris Twp., & Hanover Twp.

MP: 2.15-2.67

Estimate Range over $10,000,000


UPC #068088
Rt 7 Hackensack River Wittpenn BR Contract 2

This Rt. 7 project (Contract 2 of 4) will provide for the off-line portions of the new bridge over the Hackensack River and the improvements to the interchange of Fish House Road. There will be minimal traffic impacts with the proposed construction as the bridge and ramps are on a new alignment.

Proposed Advertised Month June, 2012

Project Details

Hudson County/Jersey City & Kearny Town

MP: 0-2

Estimate Range over $10,000,000


UPC #033171
Rt 22 Traffic Signal Improv/Signal Coordination/ITS Closed Syst
em
This project involves geometric /signal timing improvements and the construction of a closed-loop system involving eighteen (18) signalized intersections to relieve congestion and improve safety. The project also includes the installation of six (6) CCTV Cameras, two (2) Dynamic Message Signs (DMS), eight (8) TRANSMITTERS, 5,000 LF of fiber optic conduit from west of Thompson Avenue to I-287 & 2000 LF fiber optic conduit from Blue Star Drive to Park Avenue

Proposed Advertised Month June, 2012

Project Details

Somerset County/Green Brook Twp., North Plainfield Boro & Watchung Boro

MP: 36.45-50.25

Estimate Range $5,000,001 - $10,000,000


UPC #113200
Collings Avenue (CR 630) over Route I-676 SB

This project calls for the replacement of the existing bridge deck and parapet on the entire structure, Minor repairs to the superstructure may be required and it is anticipated that minor repairs to the substructure are required (spalling and cracks). Incidental roadway work, including milling and paving the approach slabs and the replacement of the guide rail, in order to upgrade it to current standards is required.

Proposed Advertised Month August, 2012

Project Details

Camden County/Camden City

MP: 0.15-.065

Estimate Range $1,000,001 - $5,000,000


UPC #960249
Rt 50 Tuckahoe River Bridge (2E 3B)

Replacement of the Rt. 50 bridge over Tuckahoe River. Reconstruction of approaches, including intersection of Rt. 49 & 50. A left-turn lane will be added to Rt. 50 North at Marshall Avenue and a left-turn lane will be added to Rt. 50 North at Rt. 49. Sidewalks, curb and drainage to be replaced. Context sensitive treatments and historic-look lighting are proposed in historic district.

Proposed Advertised Month August, 2012

Project Details

Cape May & Atlantic Counties/Upper Twp., Corbin City

MP: 6.2-7.2

Estimate Range over $10,000,000


UPC #970237
Rt 23 Sussex Boro Realign & Papakating Creek Bridge Replace

This project consists of a one-way couple that will utilize the existing Route 23 and Walling Avenue in Sussex Borough and Wantage Township in Sussex County. Also, the replacement of the bridge (Structure Number 1904154) over the Papakating Creek.

Proposed Advertised Month August, 2012

Project Details

Sussex County/Sussex Boro, Wantage Twp

MP: 39.22-40.1

Estimate Range over $10,000,000


UPC #033190
Rt 22 Sustainable Corridor Short-term Projects

Safety improvements at Lone Star and North Bridge Street., at N. Gaston Avenue (U-turn), at Adamsville Road (U-turn), at Grove Street; operational improvements Eastbound at Mountain Ave.

Proposed Advertised Month September, 2012

Project Details

Somerset County/Bridgewater Twp & Somerville Boro

MP: 33.88-36.82

Estimate Range $1,000,001 - $5,000,000


UPC #960697
Rt 27 Sec 3E Six Mile Run Bridge

Bridge replacement with 2 12-foot lanes with 10-foot shoulders along both sides; sidewalk on the SB side of the bridge.

Proposed Advertised Month September, 2012

Project Details

Middlesex & Somerset Counties/North Brunswick Twp & Franklin Twp.

MP: 11.45-11.65

Estimate Range $1,000,001 - $5,000,000


UPC #103350

Rt 30 E of Brand Ave to E of London Ave Pavement Rehab
As a result of field testing, the EB &WB directions of Route 30 are generally in either poor or fair condition. The proposed improvements encompass milling and resurfacing of all lanes and shoulders from MP 13.89 to MP 16.36 and MP 16.66 to MP 18.15. Such work will improve the service life of the roadway by approximately 15 years.

 

Proposed Advertised Month September, 2012

Project Details

Camden County/Berlin Boro, Lindenwold Boro, Clementon Boro

MP: 13.89-16.36 & 16.66-18.15

Estimate Range $1,000,001 - $5,000,000


UPC #113000
Rt 295/42/I-76, Direct Connect, Contract 1

This project will relieve the existing bottleneck at the interchange by constructing a direct connection on I-295 and other highway improvements that will reduce congestion and enhance traffic operations and safety throughout the project area. The improvements include a six lane mainline through the interchange, elimination of dangerous merging and weaving movements, upgrades to ramp geometry and the addition of shoulders throughout the interchange.

Contract 1 will include the reconstruction of I-295 from the southern limit of the project to the bridge crossing over Essex Avenue; reconstruction and widening of I-76 from the westerly project limit to west of King's Highway; the replacement of the Bell Road Bridge and Creek Road bridges over I-76 and Route 42; the construction of the new Ramp E bridge (I-295 NB to I-76) over Route 42; and the construction of a temporary ramp to eliminate the existing weave between Route 42 NB and I-295 traffic for the entire construction duration of the interchange reconstruction.

Proposed Advertised Month September, 2012

Project Details

Camden County/Bellmawr Boro, Gloucester City, Mount Ephraim Boro

MP: 26-26.93

Estimate Range over $10,000,000


UPC #103340

Rt 208 S of Rt 4 to Boulevard Ave, Pavement Resurfacing
Pavement rehabilitation on Rt. 208 between mp 0.0-3.32. Pavement rehabilitation rank #22 on the Pavement Projects List.

Proposed Advertised Month September, 2012

Project Details

Bergen County/Fair Lawn Boro, Glen Rock Boro

MP: 0.0-3.32

Estimate Range $1,000,001 - $5,000,000


UPC #093240

Groveville Road over Rt 130
This project will replace the Groveville Road (CR 609) superstructure over Route 130, structure No. 1122-151. In addition, the guiderail in all four quadrants will be upgraded to current standards and the approach roadway will be resurfaced in both directions. Minor substructure repairs will be performed.

Proposed Advertised Month September, 2012

Project Details

Mercer County/Hamilton Township

MP: 58.66-58.66

Estimate Range $1,000,001 - $5,000,000


UPC #113210

Weldon Rd - Espanong Rd over Route 15
The Structural Evaluation Unit and the Bridge Management System have identified this structure, Weldon Road-Espanong Road over Route 15, as being in need of a deck replacement based on the condition rating of 4 (poor) for the deck.

Proposed Advertised Month September, 2012

Project Details

Morris County/Jefferson Twp.

MP: 0.0-0.21

Estimate Range $1,000,001 - $5,000,000


UPC #103160
Rt 27 N of Evergreen St to vic of Elizabeth River, Resurf

Pavement Rehabilitation at the following locations: mp 23.8-26.7; mp 27.2-34.1.

Proposed Advertised Month September, 2012

Project Details

Middlesex & Union County/Edison, Woodbridge Township & Rahway City

MP: 23.8-26.7; 27.2-34.1

Estimate Range $5,000,001 - $10,000,000


UPC #960326

Rt 35 Greenwood Drive to Prospect Avenue
Roadway rehabilitation, widening, drainage, safety improvements, 4 intersection improvements & culvert replacement.

Proposed Advertised Month September, 2012

Project Details

Monmouth & Middlesex Counties/Aberdeen & Old Bridge Township

MP: 44.47-45.72

Estimate Range  over $10,000,000


UPC #961283

Rt 10 Commerce Blvd
The project is located at the intersection of Rt 10 and Commerce Blvd in Roxbury Twp, Morris Co. Project was downsized from a widening of Route 10 and reconstuction of Commerce St. intersection, to a minor reconfiguration to the intersection with a new signal at Commerce Blvd / Main St. Also a new signal will be provided at a proposed median barrier opening on Rt 10 at Mary Louise Avenue.

Proposed Advertised Month September, 2012

Project Details

Morris County/Roxbury Township

MP: 0.1-091

Estimate Range $5,000,001 - $10,000,000


UPC #083140

Rt 57 Superstructure Replacements, Mansfield Twp
This project will replace exisiting superstructures on three Rt 57 Bridges. The structures are as follows: Route 57 over Branch of Musconetcong River, Structure #2106-506 @ MP 13.91; Route 57 over Branch of Musconetcong River, Structure #2106-157 @ MP 14.07 and; Route 57 over Branch over Hances Brook, Strucutre #2106-164 @ MP 18.13. All three structures are in Mansfield Twp, Warren County.

Proposed Advertised Month October, 2012

Project Details

Warren County/Mansfield Township

MP: 13.91-14.07

Estimate Range $1,000,001 - $5,000,000

 

Operations
Project/Work Description

 

FHWA Bridge Preventive Maintenance Contract 2012

Proposed Advertised Month May, 2012

Project Details

Thirty (30) Bridges on Routes 18, 33, 35 and 71 Structure No.'s 1328-154, 1328-155, 1329-159, 1329-169, 1323-151, 1323-154, 1323-155, 1323-156, 1323-158, 1323-161, 1323-162, 1323-166, 1324-156, 1324-157, 1325-150, 1325-155, 1331-150, 1331-151, 1331-152, 1331-153, 1331-154, 1332-150, 1332-151, 1332-153, 1332-159, 1305-163, 1317-158, 1317-159, 1311-158, 1311-157/Colts Neck Township, Eatontown Boro, Freehold Township, Howell Township, Manalapan Township, Marlboro Township, Neptune City Boro, Neptune Township, Tinton Falls Boro, Wall Township/Monmouth County

Estimate Range $1,000,000 - $5,000,000


Maintenance Sign Structure Contract, Statewide - 2012

Proposed Advertised Month June, 2012

Project Details

Various locations/Statewide

Estimate Range $500,000 - $1,000,000


Maintenance Roadway Repair Contract South, Sub-Region S-2, Contract No. S205

Proposed Advertised Month July, 2012

Project Details

Route 45 MP 0.37 - 4.12, Route 47 MP 39.30 - 41.7, Route 49 MP 0.03 - 5.67 and MP 27.0 - 31.4/Bridgeton City, Fairfield Township, Mannington Township, Millville City, Pennsville Township, Salem City/Cumberland and Salem Counties

Estimate Range $5,000,000 - $10,000,000


Maintenance Roadway Repair Contract Central, Sub-Region C-3, Contract No. C305

Proposed Advertised Month July, 2012

Project Details

US 9 MP 66.02 - 70.25, Route 72 MP 13.0 - 18.5, 19.7 - 20.5/Barnegat Township, Eaglewood Township, Stafford Township/Ocean County

Estimate Range $5,000,000 - $10,000,000


FHWA Drainage Restoration Contract, North 2012

Proposed Advertised Month July, 2012

Project Details

Various locations/North Region

Estimate Range $1,000,000 - $5,000,000


FHWA Drainage Restoration Contract, South 2012

Proposed Advertised Month July, 2012

Project Details

Various locations/South Region

Estimate Range $1,000,000 - $5,000,000


FHWA Bridge Preventive Maintenance Contract 2012-1

Proposed Advertised Month July, 2012

Project Details

Twelve (12) Bridges, I-78 MP 13.42 - 29.67/Bedminster Township, Clinton Township, Lebanon Boro, Readington Township, Tewksbury Township, Union Township/Hunterdon & Somerset Counties

Estimate Range $1,000,000 - $5,000,000


Maintenance Hot Mix Asphalt Pavement Repair Contract, North - 2013

Proposed Advertised Month August, 2012

Project Details

Various Locations/North Region

Estimate Range $1,000,000 - $5,000,000


Maintenance Hot Mix Asphalt Pavement Repair Contract, Central - 2013

Proposed Advertised Month August, 2012

Project Details

Various Locations/Central Region

Estimate Range $1,000,000 - $5,000,000


Maintenance Hot Mix Asphalt Pavement Repair Contract, South - 2013

Proposed Advertised Month August, 2012

Project Details

Various Locations/South Region

Estimate Range $1,000,000 - $5,000,000


 

 

 
Go to NJDOT home page Contact Us | Privacy Notice | Legal Statement | Accessibility Statement  Go to State of New Jersey home page
  department: home | about | NJ commuter | in the works | business | engineering | freight, air & water | capital | community | data | links | index
  statewide: NJ Home | about NJ | business | government | state services A to Z | departments

  Copyright © State of New Jersey, 2002-2012
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600
OPRA - open public records act

  Last Updated:  May 7, 2012