Guide rail parapet attachment at Route 18 southbound bridge over Conrail Railroad, Milepost 37.5
  • All lanes will be milled and resurfaced, with full reconstruction of the right lane in each direction to correct substandard cross slopes and pavement section.
  • Guide rail and concrete median barrier will be upgraded to current NJDOT standards.
  • Sidewalk improvements will complete missing sections and upgrade pedestrian facilities for ADA compliance.
  • Traffic signals and Intelligent Transportation Systems (ITS) will be upgraded to current NJDOT standards for connectivity and central monitoring.
Drainage and Stormwater Management Improvements
Sample of deteriorated drainage pipe within Route 18 project corridor (non-specific location)
  • Existing and deteriorated corrugated metal pipes will be replaced with reinforced concrete pipe that meet current standards
  • Lateral drainage crossings will reconstruct 42 existing crossings and add 4 new crossings
  • Longitudinal pipe runs will be replaced in their entirety
  • 2 new bioretention basins will be constructed
  • 2 wet ponds will be reconstructed
  • 1 detention basin will be rehabilitated
  • 3 new Manufactured Treatment Devices will be installed
Drainage and Stormwater Management Improvements
  • Over 11,000 feet of 24-inch gas main to be reconstructed.
  • Over 24,000 feet of 8-inch, 12-inch, 16-inch and 20-inch water mains to be reconstructed, including all connections and services.
  • Miscellaneous power and telecommunication poles and wires will be relocated to mitigate project conflicts.
View of overhead utilities to be relocated at Eggers Street pedestrian bridge and Route 18 southbound, Milepost 39.3